Performance Assessment of an Industrial Waste Heat Boiler Using Minimum Variance Control
Abstract
3000. The results show that for SISO system the performance index is equal to 0.026, whereas for SIMO system with the input BFW to superheater with the output steam temperature and steam flow, index performance equal is to 0.036.
References
Liptak, Béla G., Optimization of Industrial Unit Processes, CRC Press LLC, USA, 1999.
Huang, B. and S.L. Shah, Performance Assessment of Control Loops: Theory and Applications. New York, Springer Verlag, 1999
Nazaruddin, Y.Y., Performance Audit of Process Controllers : A Case Study in a Petrochemical Plant, invited paper on Regional Conference on
Instrumentation and Control (CIC’2007), Bandung, 2007
Hugo, Alan J., Process Controllers Performance Monitoring and Assessment, http://www.controlartsinc.com
Harris, T.J. and C.T. Seppala, Recent Development in Performance Monitoring and Assessment Techniques, http://appsci.queensu.ca/tjh/publications/cpc6harris_seppala.pdf
Johansson, R., System Modelling and Identification, Prentice-Hall, 1992
Andrzej, O. and M. Grimble, Minimum Variance Control, March. 2002 http://www.icc.strath.ac.uk/~ordys/Teaching
Hirmawan, Y, Penerapan Advanced Process Control (APC) pada Waste Heat Boiler di PT. Petrokimia Gresik, Final project, ProDi Teknik Fisika, Institut Teknologi Bandung, 2004
DOI: http://dx.doi.org/10.21535%2FProICIUS.2007.v3.636
Refbacks
- There are currently no refbacks.